You must be a CTBUH Member to view this resource.
Kula Belgrade
St. Regis Belgrade, Belgrade Tower
Building
Completed
2023
Residential / Hotel
All-Concrete
168 m / 551 ft
42
220
119
305
47,500 m² / 511,286 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
27 January 2021
The President of Serbia, Aleksandar Vučić, visited the construction site of the Belgrade Waterfront. The construction site tour was also attended by the Minister of...
27 January 2021
The President of Serbia, Aleksandar Vučić, visited the construction site of the Belgrade Waterfront. The construction site tour was also attended by the Minister of...
07 February 2019
The Serbian Ministry of Construction, Transportation, and Infrastructure has issued a building permit for the construction of the Kula Beograd (Tower Belgrade) building. The building,...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy