You must be a CTBUH Member to view this resource.
Omkar Alta Monte
Complex
Under Construction
residential
669
Note: Only buildings that have GPS coordinates recorded are displayed.
Rank
|
Building Name
|
Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished
|
Completion
|
Height
|
Floors
|
Material
|
Use
|
---|---|---|---|---|---|---|---|
1 | Omkar Alta Monte Tower B | 2022 | 218 m / 715 ft | 61 | All-Concrete | Residential | |
2 | Omkar Alta Monte Tower C | 2017 | 198 m / 650 ft | 58 | All-Concrete | Residential | |
3 | Omkar Alta Monte Tower A | 2015 | 180 m / 591 ft | 53 | All-Concrete | Residential | |
4 | Omkar Alta Monte Tower D | 2024 | - m / - ft | 61 | All-Concrete | Residential |
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy