You must be a CTBUH Member to view this resource.
Flame Towers
Complex
Completed
hotel / office / residential / serviced apartments
156
299
3,480
Note: Only buildings that have GPS coordinates recorded are displayed.
Rank
|
Building Name
|
Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished
|
Completion
|
Height
|
Floors
|
Material
|
Use
|
---|---|---|---|---|---|---|---|
1 | Flame Tower 1 | 2013 | 181.8 m / 596 ft | 39 | Steel Over Concrete | Residential | |
2 | Flame Tower 2 | 2013 | 164.6 m / 540 ft | 36 | Steel Over Concrete | Serviced Apartments / Hotel | |
3 | Flame Tower 3 | 2013 | 160.8 m / 528 ft | 28 | Steel Over Concrete | Office |
19 September 2012
The variety of architectural ideas, the need to save energy and the specific demands of high-rise construction, different locations, locally available construction techniques and climate...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy