You must be a CTBUH Member to view this resource.
SUNAC A-ONE
Complex
Under Construction
hotel / office / residential
108
Note: Only buildings that have GPS coordinates recorded are displayed.
Rank
|
Building Name
|
Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished
|
Completion
|
Height
|
Floors
|
Material
|
Use
|
---|---|---|---|---|---|---|---|
1 | SUNAC A-ONE Tower 1 | 2030 | 470 m / 1,542 ft | 101 | Concrete-Steel Composite | Hotel / Office | |
2 | SUNAC A-ONE Tower 4 | 2026 | 349 m / 1,145 ft | 89 | composite | Residential | |
3 | SUNAC A-ONE Tower 2 | 2024 | 302.1 m / 991 ft | 72 | Concrete-Steel Composite | Office | |
4 | SUNAC A-ONE Tower 3 | 2029 | 251 m / 823 ft | 61 | N/A | Office |
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy