Indonesia-1

Jakarta
  • Facts
  • Login

    You must be a CTBUH Member to view this resource.

    Metrics
Official Name
The current legal building name.

Indonesia-1

Type

Complex

Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished

Under Construction

Country

Indonesia

City

Jakarta

Function

office / serviced apartments

Development GFA
Development GFA refers to the total gross floor area within the entire development in which a tower exists, and may therefore be at times the total sum of several towers and related low-rise buildings.

170,000 m² / 1,829,865 ft²

Map of Buildings in Complex

Note: Only buildings that have GPS coordinates recorded are displayed.

 

List of Buildings in Complex

Rank
Building Name
Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished
Completion
Height
Floors
Material
Use
1 Indonesia-1 North Tower
2024 306 m / 1,004 ft 63 Concrete-Steel Composite Serviced Apartments / Office
2 Indonesia-1 South Tower
2024 303.5 m / 996 ft 57 Concrete-Steel Composite Office

Research

30 January 2020

Tall Building Predictions for 2020

CTBUH Research

The combined brains of the CTBUH editorial and database staff boldly predict what might happen across the global skyscraper industry in 2020. Check out our...