CTBUH Silver Member

GGLO

About

Member Since: 2013

Member Offices: Los Angeles, Seattle

Website: http://www.gglo.com

By integrating key disciplines under one roof and measuring success by the quality of their relationships, GGLO have established themselves as one of the foremost design firms on the West Coast.

Their sustainable design experience demonstrates that environmental, social, and economic sustainability are not only compatible, but are also mutually sustaining. Nearly half their firm is LEED® Accredited, and the majority of their projects are pursuing sustainability benchmarking systems.

GGLO exists to forge innovative solutions that elevate the quality and spirit of life. They help create and revitalize communities—building-by-building and block-by-block.

Fields of Expertise

Architecture; Interior Design; Landscape Architecture; Urban Design

Membership details

Membership Level

Silver

Member Since

2013

Member Offices

  • Los Angeles

  • Seattle

Buildings

Rank
Name
Status

Completed

Architecturally Topped Out

Structurally Topped Out

Under Construction

On Hold

Proposed

Vision

Never Completed

Demolished

Competition Entry

Canceled

Proposed Renovation

Under Renovation

Renovated

Under Demolition

Height

1

Via6 North Tower

81.4 m / 267 ft

2

Via6 South Tower

81.4 m / 267 ft

Building Completions Timeline

 
Rank
Name
City
Height

1

Trinity Centre at Bayview Station Tower 1

Ottawa

223 m

732 ft

2

Seattle House North Tower

Seattle

142 m

465 ft

2

Seattle House South Tower

Seattle

142 m

465 ft

4

Via6 North Tower

Seattle

81 m

267 ft

4

Via6 South Tower

Seattle

81 m

267 ft

6

Trinity Centre at Bayview Station Tower 2

Ottawa

- m

- ft

7

Trinity Centre at Bayview Station Tower 3

Ottawa

- m

- ft

Statistics

Average Building Age*

8 Years

Most Common Function*

Residential (100%), 2 Buildings

Most Common Material*

Concrete (100%), 2 Buildings

* Based on 150 m+ buildings currently in the database.

Total: 2 Buildings for which a function has been assigned.
 
Total: 2 Buildings for which a material has been assigned.
 

*Based on 2 Completed & Under Construction Buildings

Building Completions Timeline

 

Construction Time Chart

NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.

 

CTBUH Initiatives Involving GGLO

CTBUH Seattle Debates HALA’s Impact on Downtown Development

18 April 2017

The annual CTBUH Seattle Spring Forum featured a panel discussion examining and interpreting the impact of Seattle’s "HALA" on future downtown development.

Ctbuh Leaders At GGLO

Sean Canady

CTBUH Seattle Chapter, 2018 – Present

Sean Canady

Seattle