CTBUH Silver Member

Bouygues Immobilier

About

Member Offices: Paris

Website: https://www.bouygues-immobilier-corporate.com/en

An urban developer/operator, Bouygues Immobilier develops residential, office building, retail and sustainable neighbourhood projects from 33 branches in France and four in other countries. Bouygues Immobilier is a leading player in the French housing market. In partnership with local authorities, our company works for a sustainable and desirable urban environment.

Fields of Expertise

Developer; Urban Design

Membership details

Membership Level

Silver

Member Since

Member Offices

  • Paris

Buildings

Rank
Name
Status

Completed

Architecturally Topped Out

Structurally Topped Out

Under Construction

On Hold

Proposed

Vision

Never Completed

Demolished

Competition Entry

Canceled

Proposed Renovation

Under Renovation

Renovated

Under Demolition

Height

1

MahaNakhon

314 m / 1,030 ft

2

CapitaSpring

280 m / 919 ft

3

The River South Tower

258 m / 846 ft

4

The Sail @ Marina Bay

245 m / 804 ft

5

Tour First

231 m / 758 ft

6

The Met

230.6 m / 756 ft

7

North Point Tower 1

226 m / 741 ft

8

Qatar Petroleum District Tower 7

222.8 m / 731 ft

9

Oberoi Enigma Tower 1

201 m / 659 ft

10

Oberoi Enigma Tower 2

201 m / 659 ft

Awards

Manhattan Loft Gardens

Award of Excellence: Manhattan Loft Gardens

Best Tall Building 100-199 meters 2019

Ctbuh Leaders

Edward Woods

Edward Woods

CTBUH Chapter Board Member, 2019 – Present

Paris

Building Completions Timeline

 

Videos

30 May 2018

A City of Justice for the City of Light

The new Paris Courthouse, with an internal area of around 100,000 square meters, accommodates up to 8,000 people per day. The building has a plinth...

View all

Research

28 July 2018

Damping Technologies for Tall Buildings

The scope of this paper is to review the possible solutions for modifying building motions through dampers. The three main categories of devices on the...

View all

Global News

10 January 2020

Under-Construction Tower Breaks 148-Year-Old Height Record in Bristol

A record which has stood in Bristol for 148 years has finally been broken. The moment came when one of the huge cranes in Bristol...

View all

Associated companies

Rank
Name
City
Height

1

Hermitage Plaza South Tower

Courbevoie

320 m

1,050 ft

2

Hermitage Plaza East Tower

Courbevoie

320 m

1,050 ft

3

MahaNakhon

Bangkok

314 m

1,030 ft

4

Tour Osmose

Puteaux

284 m

932 ft

5

CapitaSpring

Singapore

280 m

919 ft

6

The River South Tower

Bangkok

258 m

846 ft

7

The Sail @ Marina Bay

Singapore

245 m

804 ft

8

Tour First

Courbevoie

231 m

758 ft

9

The Met

Bangkok

231 m

756 ft

10

North Point Tower 1

Pattaya

226 m

741 ft

11

Qatar Petroleum District Tower 7

Doha

223 m

731 ft

12

Tour Air2

Courbevoie

207 m

679 ft

13

Oberoi Enigma Tower 1

Mumbai

201 m

659 ft

13

Oberoi Enigma Tower 2

Mumbai

201 m

659 ft

15

Oberoi Eternia Tower 1

Mumbai

192 m

630 ft

15

Oberoi Eternia Tower 2

Mumbai

192 m

630 ft

17

Noble Ploenchit Tower B

Bangkok

185 m

607 ft

18

Tour Charenton

Charenton-le-Pont

180 m

591 ft

19

North Point Tower 2

Pattaya

177 m

581 ft

20

D2 Tower

Courbevoie

171 m

561 ft

21

Tour Odeon

Monaco

170 m

558 ft

22

Noble Ploenchit Tower C

Bangkok

165 m

541 ft

23

New Futura North Tower

Singapore

160 m

525 ft

23

New Futura South Tower

Singapore

160 m

525 ft

25

Tour ALTO

Courbevoie

160 m

525 ft

26

Tribunal de Paris

Paris

160 m

524 ft

27

The River North Tower

Bangkok

152 m

498 ft

28

The Infinity Sathorn Square

Bangkok

150 m

492 ft

29

Sculptura Ardmore

Singapore

147 m

481 ft

30

The Stratford

London

142 m

466 ft

31

Trevista 1/2

Singapore

134 m

441 ft

31

Trevista 3

Singapore

134 m

441 ft

33

Cube 8

Singapore

132 m

434 ft

34

Clement Canopy North Tower

Singapore

130 m

425 ft

34

Clement Canopy South Tower

Singapore

130 m

425 ft

36

Sequana Tower - Bouygues Telcom

Issy-les-Moulineaux

100 m

328 ft

37

Castle Park View

Bristol

98 m

323 ft

38

Star City Phase Two Tower 1

Yangon

91 m

299 ft

38

Star City Phase Two Tower 2

Yangon

91 m

299 ft

40

Hyatt Regency Ekaterinburg

Yekaterinburg

83 m

272 ft

41

Star City Phase Two Tower 3

Yangon

82 m

269 ft

41

Star City Phase Two Tower 4

Yangon

82 m

269 ft

41

Star City Phase Two Tower 5

Yangon

82 m

269 ft

41

Star City Phase Two Tower 6

Yangon

82 m

269 ft

45

Tour Mazars Exaltis

Courbevoie

70 m

230 ft

46

Horizon 360

Le Harve

55 m

180 ft

47

Bâtiment Home, ZAC Masséna

Paris

51 m

167 ft

48

Sensations

Strasbourg

38 m

125 ft

49

Brunel House

Portsmouth

- m

- ft

50

Qatar Petroleum District Tower 6

Doha

- m

- ft

51

Qatar Petroleum District Hotel

Doha

- m

- ft

51

Qatar Petroleum District Tower 5

Doha

- m

- ft

51

Qatar Petroleum District Tower 8

Doha

- m

- ft

54

Qatar Petroleum District Tower 4

Doha

- m

- ft

55

Qatar Petroleum District Tower 9

Doha

- m

- ft

56

Qatar Petroleum District Tower 3

Doha

- m

- ft

57

Canning Town Phase 2 Hotel Tower

London

- m

- ft

57

Canning Town Phase 2 Residential Tower

London

- m

- ft

57

Qatar Petroleum District Tower 2

Doha

- m

- ft

60

Qatar Petroleum District Tower 1

Doha

- m

- ft

Statistics

150 m+ Buildings

300 m+ Buildings

Average Building Age*

7 Years

Most Common Function*

Residential (53%), 24 Buildings

Most Common Material*

Concrete (91%), 41 Buildings

* Based on 150 m+ buildings currently in the database.

Total: 45 Buildings for which a function has been assigned.
 
Total: 45 Buildings for which a material has been assigned.
 

*Based on 45 Completed & Under Construction Buildings

Building Completions Timeline

 

Construction Time Chart

NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.

 

30 May 2018 | Chicago

A City of Justice for the City of Light

The new Paris Courthouse, with an internal area of around 100,000 square meters, accommodates up to 8,000 people per day. The building has a plinth...

26 October 2015 | New York City

The Structural Design and Construction of MahaNakhon Tower

Bouygues-Thai was appointed by PACE Development Corporation PLC as the structural contractor for the design-build contract of MahaNakhon Tower, soon to be the tallest tower...

26 October 2015 | New York City

2015 New York Conference - Session 2d - Q&A

Kanokpat Chanvaivit, Bouygues Thai; David Wallance, FXFOWLE; and Phillip Gardiner, Irwinconsult, answer questions at the end of 2015 New York Conference Session 2d: Construction Advances.

16 September 2014 | Shanghai

MahaNakhon Tower and the Use of CTBUH Seismic Guidelines

MahaNakhon Tower developed by PACE Development Corporation PLC is a 77-Story mixed-use development in Bangkok, Thailand. It will be Bangkok’s tallest tower, standing at 314...

16 September 2014 | Shanghai

2014 Shanghai International Conference - Technical Workshop 06 - Q & A

2014 Shanghai International Conference Technical Workshop 06 Questions & Answers session with speakers Kanokpat Chanvaivit, Bouygues – Thai Co. Ltd.; Chunhe (Henry) Li, Buro Happold;...

10 October 2011 | Seoul

Renovation of an iconic tower of Paris

Renovation of a first generation of high rise building with heavy structural modification, use of drilling robots for core walls modification, extension of the tower...

10 October 2011 | Seoul

Seoul Conference 2011 Track Session 06: Q&A

Question & Answers session for Track Session 06.

28 July 2018

Damping Technologies for Tall Buildings

Alberto Lago, Hadi Moghadasi Faridani & Dario Trabucco, IUAV University of Venice

The scope of this paper is to review the possible solutions for modifying building motions through dampers. The three main categories of devices on the...

01 December 2016

An Overview of Structural & Aesthetic Developments in Tall Buildings Using Exterior Bracing & Diagrid Systems

Kheir Al-Kodmany, University of Illinois; Mir M. Ali, University of Illinois at Urbana-Champaign

There is much architectural and engineering literature which discusses the virtues of exterior bracing and diagrid systems in regards to sustainability - two systems which...

26 October 2015

The Structural Design and Construction of the MahaNakhon Tower

Kanokpat Chanvaivit, André Ly & Chloé Clair, Bouygues Thai Ltd

Bouygues-Thai was appointed by PACE Development Corporation PLC as the structural contractor for the design-build contract of MahaNakhon Tower, soon to be the tallest tower...

26 October 2015

Challenges of Building Brickell CityCenter : a True Mixed use Mega Project Downtown Miami

Christophe Bilaine, Bouygues Bâtiment

The paper illustrates the true mixed-use sides of this mega project, and what it encompasses in terms of transportation, sustainability, logistics, and all innovation features...

16 September 2014

MahaNakhon Tower and the Use of CTBUH Seismic Guidelines

Kanokpat Chanvaivit, Bouygues-Thai Co. Ltd.

MahaNakhon Tower developed by PACE Development Corporation PLC is a 77-Story mixed-use development in Bangkok, Thailand. It will be Bangkok’s tallest tower, standing at 314...

13 December 2010

The Sail at Marina Bay, Singapore

Alfred A Yee & Kang Jianhan, Precast Design Consultants Pte. Ltd; Frederic Perez, Dragages Singapore Pte. Ltd; Juneid Qureshi, Meinhardt Singapore Pte. Ltd.

As the world population continues to grow exponentially, it is anticipated that development of suburban properties will become less popular as it stretches our natural...

10 January 2020

Under-Construction Tower Breaks 148-Year-Old Height Record in Bristol

A record which has stood in Bristol for 148 years has finally been broken. The moment came when one of the huge cranes in Bristol...

08 January 2020

Mixed-Use Building Planned for Le Havre

After the Videcoq and Dumont-d'Urville towers, a third building is planned to further densify downtown Le Havre.  The tower is part of a project by...

09 July 2019

Two 40-Story Towers Completed in Singapore

Last week, construction of two major towers in Singapore reached completion. The Clement Canopy complex consists of two 40-story towers with 505 luxury apartments, located...

09 July 2019

Two 40-Story Towers Completed in Singapore

Last week, construction of two major towers in Singapore reached completion. The Clement Canopy complex consists of two 40-story towers with 505 luxury apartments, located...

CTBUH Initiatives Involving Bouygues Immobilier

CTBUH France: Global Walking Tour and Chapter Inauguration

10 October 2019

As part of the 2019 Global Walking Tour, CTBUH France organized a tour of Trinity Tower, which also served as the inauguration of the new Chapter.

CTBUH Seismic Working Group Workshop Talks Industry Developments

29 October 2017

During the CTBUH 2017 Conference, the CTBUH Seismic Working Group Workshop welcomed a handful of industry experts to discuss the latest advances in performance-based seismic design.

CTBUH Florida: Tall Building Damping Technologies

25 April 2017

CTBUH Florida held a presentation on Tall Building Damping Technologies at the School of Architecture, University of Miami.

2016 CTBUH Leaders Meeting Report

16 October 2016

The Annual Leaders Meeting was held this year in conjunction with the 2016 Conference in China, bringing together the Council’s leaders from around the world.

CTBUH Florida: Construction Tour of Panorama Tower

26 July 2016

The CTBUH Florida Chapter hosted its inaugural event, a construction tour of Panorama Tower, on July 26 in Miami.

Second CTBUH Damping Research Meeting

26 October 2015

Nearly 30 industry professionals and academic experts were in attendance at the second meeting for the CTBUH research project on damping.

Ctbuh Leaders At Bouygues Immobilier

Edward Woods

CTBUH Chapter Board Member, 2019 – Present

Edward Woods

Paris