The Bridge

Warsaw

Note: As this project is under construction, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.

  • Facts
  • Login

    You must be a CTBUH Member to view this resource.

    Metrics
Height 174 m / 571 ft
Floors 40
Official Name
The current legal building name.

The Bridge

Type
CTBUH collects data on two major types of tall structures: 'Buildings' and 'Telecommunications / Observation Towers.' A 'Building' is a structure where at least 50% of the height is occupied by usable floor area. A 'Telecommunications / Observation Tower' is a structure where less than 50% of the structure's height is occupied by usable floor area. Only 'Buildings' are eligible for the CTBUH 'Tallest Buildings' lists.

Building

Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished

Under Construction

Expected Completion

2025

Country
The CTBUH follows the United Nations's definition of Country, and thus uses the lists and codes established by that organization.

Poland

City
The CTBUH follows the United Nations's definition of City, and thus uses the lists and codes established by that organization.

Warsaw

Address

71 Grzybowska

Function
A single-function tall building is defined as one where 85% or more of its usable floor area is dedicated to a single usage. Thus a building with 90% office floor area would be said to be an "office" building, irrespective of other minor functions it may also contain.

A mixed-use tall building contains two or more functions (or uses), where each of the functions occupy a significant proportion of the tower's total space. Support areas such as car parks and mechanical plant space do not constitute mixed-use functions. Functions are denoted on CTBUH "Tallest Building" lists in descending order, e.g., "hotel/office" indicates hotel function above office function.

Office

Energy Label

BREEAM targeted

Height
Architectural
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the architectural top of the building, including spires, but not including antennae, signage, flag poles or other functional-technical equipment. This measurement is the most widely utilized and is employed to define the Council on Tall Buildings and Urban Habitat (CTBUH) rankings of the "World's Tallest Buildings."

174 m / 571 ft

Floors Above Ground
The number of floors above ground should include the ground floor level and be the number of main floors above ground, including any significant mezzanine floors and major mechanical plant floors. Mechanical mezzanines should not be included if they have a significantly smaller floor area than the major floors below. Similarly, mechanical penthouses or plant rooms protruding above the general roof area should not be counted. Note: CTBUH floor counts may differ from published accounts, as it is common in some regions of the world for certain floor levels not to be included (e.g., the level 4, 14, 24, etc. in Hong Kong).

40

# of Parking Spaces
Number of Parking Spaces refers to the total number of car parking spaces contained within a particular building.

280

Construction Schedule

2021

Proposed

2021

Construction Start

2025

Completed

Architect
Design

Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.

Structural Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

WSP
MEP Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

WSP
Developer
Ghelamco Poland
Architect
Design

Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.

Architect of Record

Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.

Projekt Polsko-Belgijska Pragownia Architektury Sp. z o.o.
Structural Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

WSP
MEP Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

WSP
Other Consultant

Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).

Landscape
MOSS Amsterdam
Lighting
Licht & Soehne
Material Supplier

Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).

Concrete
CEMEX

Global News

01 November 2022

Foundation Work Wraps Up on Warsaw Office Skyscraper

The foundation plate and parking facilities have been completed for UNStudio and Ghemlaco’s The Bridge in Warsaw. The 174-meter-tall office tower is the developer’s latest...

01 November 2022

Foundation Work Wraps Up on Warsaw Office Skyscraper

The foundation plate and parking facilities have been completed for UNStudio and Ghemlaco’s The Bridge in Warsaw. The 174-meter-tall office tower is the developer’s latest...

11 July 2022

Commercial Skyscraper in Warsaw Receives Smart Building Certification

Currently, under construction at Plac Europejski, the 40-story office building developed by Ghelamco received the SmartScore and WiredScore certificates.  The SmartScore certification system is a...

31 January 2022

Preparations Begin for 40-Story Office Skyscraper in Warsaw

Ghelamco has started preparations for the construction of The Bridge skyscraper. The building will stand at the intersection of Towarowa and Grzybowska streets, next to...

09 April 2021

Skyscraper Project Proposed for Warsaw

Located next to the former headquarters of the Bellona publishing house, The Bridge will be connected to a common lobby creating an unprecedented composition on...