Sky Tower

Abu Dhabi
  • Facts
  • Login

    You must be a CTBUH Member to view this resource.

    Metrics
Height 292.2 m / 959 ft
Floors 74
Official Name
The current legal building name.

Sky Tower

Name of Complex
A complex is a group of buildings which are designed and built as pieces of a greater development.

The Gate Shams Abu Dhabi

Type
CTBUH collects data on two major types of tall structures: 'Buildings' and 'Telecommunications / Observation Towers.' A 'Building' is a structure where at least 50% of the height is occupied by usable floor area. A 'Telecommunications / Observation Tower' is a structure where less than 50% of the structure's height is occupied by usable floor area. Only 'Buildings' are eligible for the CTBUH 'Tallest Buildings' lists.

Building

Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished

Completed

Completion

2010

Country
The CTBUH follows the United Nations's definition of Country, and thus uses the lists and codes established by that organization.

United Arab Emirates

City
The CTBUH follows the United Nations's definition of City, and thus uses the lists and codes established by that organization.

Abu Dhabi

Function
A single-function tall building is defined as one where 85% or more of its usable floor area is dedicated to a single usage. Thus a building with 90% office floor area would be said to be an "office" building, irrespective of other minor functions it may also contain.

A mixed-use tall building contains two or more functions (or uses), where each of the functions occupy a significant proportion of the tower's total space. Support areas such as car parks and mechanical plant space do not constitute mixed-use functions. Functions are denoted on CTBUH "Tallest Building" lists in descending order, e.g., "hotel/office" indicates hotel function above office function.

Residential / Office

Structural Material
All-Steel
Both the main vertical/lateral structural elements and the floor spanning systems are constructed from steel. Note that a building of steel construction with a floor system of concrete planks or concrete slab on top of steel beams is still considered an “all-steel” structure as the concrete elements are not acting as the primary structure.

All-Concrete
Both the main vertical/lateral structural elements and the floor spanning systems are constructed from concrete which has been cast in place and utilizes steel reinforcement bars and/or steel reinforced concrete which has been precast as individual components and assembled together on-site.

All-Timber
Both the main vertical/lateral structural elements and the floor spanning systems are constructed from timber. An all-timber structure may include the use of localized non-timber connections between timber elements. Note that a building of timber construction with a floor system of concrete planks or concrete slab on top of timber beams is still considered an “all-timber” structure as the concrete elements are not acting as the primary structure.

Mixed-Structure
Utilizes distinct systems (e.g. all-steel, all-concrete, all-timber), one on top of the other. For example, a Steel Over Concrete indicates an all-steel structural system located on top of an all-concrete structural system, with the opposite true of Concrete Over Steel.

Composite
A combination of materials (e.g. steel, concrete, timber) are used together in the main structural elements. Examples include buildings which utilize: steel columns with a floor system of reinforced concrete beams; a steel frame system with a concrete core; concrete-encased steel columns; concrete-filled steel tubes; etc. Where known, the CTBUH database breaks out the materials used within a composite building’s primary structural elements.

All-Concrete

Height
Architectural
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the architectural top of the building, including spires, but not including antennae, signage, flag poles or other functional-technical equipment. This measurement is the most widely utilized and is employed to define the Council on Tall Buildings and Urban Habitat (CTBUH) rankings of the "World's Tallest Buildings."

292.2 m / 959 ft

To Tip
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest point of the building, irrespective of material or function of the highest element (i.e., including antennae, flagpoles, signage and other functional-technical equipment).
292.2 m / 959 ft
Occupied
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest occupied floor within the building.
276.6 m / 907 ft
Floors Above Ground
The number of floors above ground should include the ground floor level and be the number of main floors above ground, including any significant mezzanine floors and major mechanical plant floors. Mechanical mezzanines should not be included if they have a significantly smaller floor area than the major floors below. Similarly, mechanical penthouses or plant rooms protruding above the general roof area should not be counted. Note: CTBUH floor counts may differ from published accounts, as it is common in some regions of the world for certain floor levels not to be included (e.g., the level 4, 14, 24, etc. in Hong Kong).

74

Floors Below Ground
The number of floors below ground should include all major floors located below the ground floor level.

3

# of Apartments
Number of Apartments refers to the total number of residential units (including both rental units and condominiums) contained within a particular building.

474

Rankings

#
264
Tallest in the World
#
50
Tallest in Middle East
#
38
Tallest in United Arab Emirates
#
5
Tallest in Abu Dhabi

Construction Schedule

2005

Proposed

2006

Construction Start

2010

Completed

Other Consultant

Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).

Building Monitoring
Cost
Material Supplier

Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).

Owner
Sorouh Real Estate
Developer
Tameer Holding Investment; Sorouh Real Estate
Architect
Design

Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.

Arquitectonica
Architect of Record

Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.

National Engineering Bureau; RW Armstrong
Structural Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

Hyder Consulting
MEP Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

Ian Banham and Associates
Contractor
Main Contractor

The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.

Arabian Construction Company
Other Consultant

Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).

Building Monitoring
Cost
Material Supplier

Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).

Aluminium
Guangdong JMA Aluminium Profile Factory (Group) Co., Ltd.
Cladding
Jangho Group Co., Ltd.
Fire Proofing
Grace Construction Products
Steel
Eversendai Engineering

CTBUH Initiatives

CTBUH, EMI Lead Emirates Tall-Building Study Trip

23 March 2014 - Event

Regional Tours, CTBUH 8th World Congress

2 March 2008 - Event

 

Research

31 December 2010

Tallest Buildings Completed in 2010

CTBUH Research

In a year dominated by news coverage of the new “World’s Tallest Building” – Burj Khalifa, Dubai – one may be surprised to learn that,...

 

About Sky Tower

Sky Tower is the taller of two towers that rise alongside the monumental portico of The Gate project like welcoming torches (Sun Tower being the other). The façades of the towers are adorned with a series of crystals that sparkle in the sunlight. The elliptical shape reduces wind resistance and its perimeter columns provide a tube structure effect. Within the elliptical form the spaces are organized orthogonally. Certain rooms cantilever beyond the elliptical skin. From the exterior they form a series of vertical bands that emphasize the vertical thrust of the tower. From within they create a series of spaces that project into space. Giant bay windows become rooms in the sky; conference rooms, living rooms and executive offices with the ultimate three-sided corner condition.

The residences are designed for maximum views. The façade curvature emphasizes the panoramic perspective. Expansive windowed areas flood the spaces with natural light. Rooms flow gracefully into each other with minimum circulation for a contemporary lifestyle.

27 March 2014

CTBUH, EMI Lead Emirates Tall-Building Study Trip

Georges Binder, Belgium Country Leader, recently joined with Executive Master Immobilier to conduct a study trip on tall buildings to the United Arab Emirates.

6 March 2008

Regional Tours, CTBUH 8th World Congress

Though much of the Congress was focused on Dubai, there was the opportunity for delegates to witness the incredible achievements of some of the other cities in the Middle East.