Ruiwan Tower
Aedas Shenzhen Ruiwan Building, St. Regis Hotel
Building
Completed
2023
Hotel / Office
Concrete-Steel Composite
225.1 m / 739 ft
50
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
17 June 2020
The Ruiwan Tower designed by Aedas, comprising a luxurious St. Regis Hotel, super-Grade-A offices and retail components, is a gateway project and new city icon...