Note: As this project is proposed, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.
You must be a CTBUH Member to view this resource.
Park Habitat
Building
Proposed
Office
20
4
118,916 m² / 1,280,001 ft²
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
01 September 2022
Construction on a tower in downtown San Jose has been halted after a discovery that led to an archaeological assessment of the project site and...
01 September 2022
Construction on a tower in downtown San Jose has been halted after a discovery that led to an archaeological assessment of the project site and...
11 February 2021
New renderings have been released for Westbank’s mixed-use building, Park Habitat at 180 Park Avenue, Downtown San Jose. The illustrations came with the Westbank Campus...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy