New Bailey Plot A3

Salford

Note: As this project is under construction, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.

  • Facts
  • Login

    You must be a CTBUH Member to view this resource.

    Metrics
Height 61.4 m / 201 ft
Floors 13
Official Name
The current legal building name.

New Bailey Plot A3

Other Names
Other names the building has commonly been known as, including former names, common informal names, local names, etc.

Hanging Gardens of Salford

Type
CTBUH collects data on two major types of tall structures: 'Buildings' and 'Telecommunications / Observation Towers.' A 'Building' is a structure where at least 50% of the height is occupied by usable floor area. A 'Telecommunications / Observation Tower' is a structure where less than 50% of the structure's height is occupied by usable floor area. Only 'Buildings' are eligible for the CTBUH 'Tallest Buildings' lists.

Building

Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished

Under Construction

Expected Completion

2022

Country
The CTBUH follows the United Nations's definition of Country, and thus uses the lists and codes established by that organization.

United Kingdom

City
The CTBUH follows the United Nations's definition of City, and thus uses the lists and codes established by that organization.

Salford

Address

Irwell Street

Function
A single-function tall building is defined as one where 85% or more of its usable floor area is dedicated to a single usage. Thus a building with 90% office floor area would be said to be an "office" building, irrespective of other minor functions it may also contain.

A mixed-use tall building contains two or more functions (or uses), where each of the functions occupy a significant proportion of the tower's total space. Support areas such as car parks and mechanical plant space do not constitute mixed-use functions. Functions are denoted on CTBUH "Tallest Building" lists in descending order, e.g., "hotel/office" indicates hotel function above office function.

Office

Height
Architectural
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the architectural top of the building, including spires, but not including antennae, signage, flag poles or other functional-technical equipment. This measurement is the most widely utilized and is employed to define the Council on Tall Buildings and Urban Habitat (CTBUH) rankings of the "World's Tallest Buildings."

61.4 m / 201 ft

Occupied
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest occupied floor within the building.
48.3 m / 158 ft
Floors Above Ground
The number of floors above ground should include the ground floor level and be the number of main floors above ground, including any significant mezzanine floors and major mechanical plant floors. Mechanical mezzanines should not be included if they have a significantly smaller floor area than the major floors below. Similarly, mechanical penthouses or plant rooms protruding above the general roof area should not be counted. Note: CTBUH floor counts may differ from published accounts, as it is common in some regions of the world for certain floor levels not to be included (e.g., the level 4, 14, 24, etc. in Hong Kong).

13

Construction Schedule

2020

Proposed

2021

Construction Start

2022

Completed

Architect
Design

Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.

MEP Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

Other Consultant

Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).

Acoustics
Energy Concept
Sustainability
Traffic
WSP
Owner
Legal & General; Muse Developments
Developer
Homes England; Legal & General; Muse Developments
Architect
Design

Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.

Structural Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

Woolgar Hunter
MEP Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

Project Manager

The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.

Chroma Consulting
Contractor
Main Contractor

The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.

Bowmer & Kirkland
Other Consultant

Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).

Access
Peter Connell Associates
Acoustics
Cost
RPS Group
Energy Concept
Façade

These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.

Wintech Group
Geotechnical
Woolgar Hunter
Landscape
re-form Landscape Architecture Limited
Planning
Avison Young
Stormwater Management
Woolgar Hunter
Sustainability
Traffic
WSP
Wind
ArcAero

Global News

07 September 2021

Development Starts on Salford Office Building Clad in Ivy Gardens

The Salford City Council has approved the development proposal notice for plot A3 New Bailey, submitted by the English Cities fund. Planning consent for the...

07 September 2021

Development Starts on Salford Office Building Clad in Ivy Gardens

The Salford City Council has approved the development proposal notice for plot A3 New Bailey, submitted by the English Cities fund. Planning consent for the...

10 February 2021

Go-Ahead Granted for Living Green Façade High-Rise

Make Architects has won approval for an 12-story office block in New Bailey, Salford, featuring a living façade.The building contains 10,600 square meters of office...