You must be a CTBUH Member to view this resource.
Le Méridien New Orleans
Holiday Inn Crowne Plaza, Four Points by Sheraton Downtown, W New Orleans Hotel, Hotel New Orleans Downtown
Building
Completed
1984
Hotel
85 m / 279 ft
23
423
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy