You must be a CTBUH Member to view this resource.
LCT The Sharp Residential Tower B
Triple Square Resort Tower C, Haewundae Tourism Resort Tower C
Building
Completed
2019
Residential
All-Concrete
333.1 m / 1,093 ft
85
5
16
5 m/s
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
27 October 2015 | Busan
An essential element of skyscraper architecture lies in its adaptability to an existing environment. For its massiveness in height and size, a skyscraper, while becoming...
12 December 2019
CTBUH Research
The year 2019 was remarkable for the tall building industry, with 26 supertall buildings (300 meters or taller) completed, the most in any year. This...
27 March 2019
POSCO Engineering & Construction has completed the structural work for Haeundae LCT The Sharp, a high-rise apartment complex in Busan, three-and-one-half years after the buildings’...
12 December 2019
CTBUH Research
The year 2019 was remarkable for the tall building industry, with 26 supertall buildings (300 meters or taller) completed, the most in any year. This...
17 October 2016
Kwang Ryang Chung, Dong Yang Structural Engineers
In the early twentieth century, many countries were obsessed with high-rise buildings taller than 100 stories, and Korea was swept up in the challenge to...
01 September 2016
Kwangryang Chung & Chulho Park, Dongyang Structural Engineers Co., Ltd; Dohun Kim, POSCO E&C
Busan’s Haeundae Resort project, which is currently being constructed by POSCO E&C, comprises the 101-story Landmark Tower and two 85-story residential towers. Presently, foundation and...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy