This project was renovated in 2016 and replaced by South Bank Tower
You must be a CTBUH Member to view this resource.
King`s Reach Tower
Building
Completed
1978
Office
106.9 m / 351 ft
30
Construction Start
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
17 October 2016
Albert Williamson-Taylor, AKT II Limited
The incredibly rapid urbanization observed in many of the larger cities in the world is forcing society, and the construction industry in particular, to think...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy