International House South
Building
Completed
2017
Office / Retail
Timber Over Concrete
6 Star Green Star Design and 5 Star-plus NABERS rating
30 m / 98 ft
7
7,900 m² / 85,035 ft²
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
29 October 2017 - Event
23 May 2022
CTBUH Research
This data study represents the significant recent momentum of the mass-timber movement worldwide. There are now 139 mass timber buildings around the world of eight...
10 February 2020
ASX-listed casino operator Crown Resorts has unveiled early images for Sydney's first six-star hotel and its serviced apartments at One Barangaroo, a controversial AU$2.4-billion (US$1.6-billion)...
23 May 2022
CTBUH Research
This data study represents the significant recent momentum of the mass-timber movement worldwide. There are now 139 mass timber buildings around the world of eight...
04 April 2022
Lisa Thom, Lendlease
As the tall building industry increasingly becomes interested in using engineered mass timber to construct high-rise buildings, the economical and construction-efficiency advantages need to be...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy