You must be a CTBUH Member to view this resource.
Guiyang World Trade Center Landmark Tower
Zhongtian Tower
Building
On Hold
Serviced Apartments / Hotel / Office
Concrete-Steel Composite
380 m / 1,247 ft
92
Proposed
Construction Start
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
26 October 2015 | Guiyang
The acute global concern about resource depletion is driving a reconsideration of the tall building typology. Expectations for energy and material efficiencies are ever increasing...
02 June 2017
Luke Leung, Yue Zhu, Stephen Ray & Adri Jevtic, Skidmore, Owings & Merrill LLP
A generation of tall buildings has been dominated by International Style with full height glazing that is often vision glass. Large glass was intended to...
02 June 2017
Luke Leung, Yue Zhu, Stephen Ray & Adri Jevtic, Skidmore, Owings & Merrill LLP
A generation of tall buildings has been dominated by International Style with full height glazing that is often vision glass. Large glass was intended to...
26 October 2015
Scott Duncan, Brant Coletta & Rami Abou-Khalil, Skidmore, Owings & Merrill; Yuping Luo, Zhongtian Urban Development Group Co., Ltd
The acute global concern about resource depletion is driving a reconsideration of the tall-building typology. Expectations for energy and material efficiencies are always increasing –...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy