You must be a CTBUH Member to view this resource.
Fusion Students Sheffield Tower 1
Building
Completed
2021
Residential
58 m / 190 ft
17
You must be a CTBUH Member to view this resource.
Construction Start
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
11 December 2019
ISG has been appointed as the main contractor for a £46.5 million (US$61 million) purpose-built student accommodation project in Sheffield. The Fusion Students Sheffield scheme...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy