Frame
Building
Canceled
2023
Office / Retail
Timber Over Concrete
5.0 Star NABERS Energy Rating; 5 Star Green Star; WELL Gold Standard
82.1 m / 269 ft
18
4
19,400 m² / 208,820 ft²
Proposed
Completed
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
01 October 2020 | Melbourne
Engineering a 12-Story Mass Timber Building Over an Existing Retail Center: 500 Lonsdale Street in Melbourne, Australia
29 May 2019
Property company GPT Group has unveiled the design for what might be Australia’s tallest timber building, a 12-story office tower. Planned to be built at...
Frame is planned as a 12 story timber frame structure constructed atop the existing Melbourne Central retail building.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy