This project was renovated in 2012 and replaced by Torre Garibaldi A
Ferrovie dello Stato 1
F. S. Tower 1, State Railways Administration Tower 1
Building
Completed
1992
Office
Concrete Over Steel
122 m / 400 ft
28
145
8
23,751 m² / 255,654 ft²
Proposed
Construction Start
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy