Claremont Hall
Union Theological Seminary Tower
Building
Completed
2023
Residential / Office / Education
All-Concrete
LEED Gold targeted
142 m / 466 ft
42
32,060 m² / 345,091 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
20 October 2021
A high-rise adjacent to the Columbia University campus in New York city just structurally topped out. Claremont Hall’s concrete superstructure is now finished, and the...
20 October 2021
A high-rise adjacent to the Columbia University campus in New York city just structurally topped out. Claremont Hall’s concrete superstructure is now finished, and the...
03 January 2019
The Union Theological Seminary Campus in Morningside Heights is planning to construct a 42-story tower as part of a $125 million rehab of its campus....