Note: As this project is architecturally topped out, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.
You must be a CTBUH Member to view this resource.
Aloft Hotel
450 Eleventh Avenue
Building
Architecturally Topped Out
2025
Hotel
All-Concrete
195.8 m / 642 ft
51
379
25,121 m² / 270,400 ft²
Proposed
Construction Start
Completed
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
09 September 2019
Boston Properties has filed permits for a 888-foot-tall (270-meter-tall) tower at 3 Hudson Boulevard. There have been many changes to the development since the Moinian...
09 September 2019
Boston Properties has filed permits for a 888-foot-tall (270-meter-tall) tower at 3 Hudson Boulevard. There have been many changes to the development since the Moinian...
26 August 2019
A new rendering has been released for 450 Eleventh Avenue, a 487-foot (148.4-meter) hotel tower by Marx Development Groups near Hudson Yards. The redesign appears...
08 April 2019
Developer Tishman Speyer has released renderings for 99 Hudson Boulevard, a 44-story office building at Hudson Yards. The site sits along 11th Avenue between West...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy