You must be a CTBUH Member to view this resource.
Al Tijaria Tower
Kuwait Trade Center, Al Sour Garden Tower
Building
Completed
2009
Office
Concrete-Steel Composite
218.2 m / 716 ft
41
2
740
8
60,386 m² / 649,989 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
18 August 2016 - CTBUH Research
The form of Al Tijaria Tower (also known as the Kuwait Trade Center) is inspired by a spiral or helix. The body of the tower “twists” by 80 degrees as it climbs from the ground level to the top-most occupied floor. The tower plate is organized with a circular-shaped core located in the center of the floor. A concentric ring of structural columns allows for variation in slab edge location while keeping columns vertically aligned from floor to floor. This slab edge adjustment creates a twisted exterior massing for the tower. The tower features internal, vertically stacked, six-story-high atrium gardens rising through the height of the tower. The stacked atrium gardens spin around the center of the plate, creating a dynamic twisted space rising through the tower.
The exterior cladding design of the tower is a smooth aluminum and glass unitized curtain wall system. Materials include insulated blue-tinted vision and spandrel glass with selected use of silver aluminum panels. Glazing the atrium is insulated “clear” low-E glass (with custom ceramic frit pattern to control solar heat gain) supported by a stainless steel point-fixation system. Contrasting the tower, the podium is clad in a combination of natural stone and pre-cast concrete.
The Tower is composed of a five-story podium shopping mall, with an open-to-sky garden terrace on the podium roof, and an office tower rising above. The structural system of the shopping mall is a waffle slab with columns located on a 9m x 9m (29.5ft x 29.5ft) grid. Office floors are reinforced concrete slabs supported on structural steel beams. The floor plates rotate 2.0 degrees clockwise as they rise. Horizontal stability was provided using a number of strong core walls together with a 21m (69ft) diameter core wall in the tower area. The twelve equally-spaced tower columns are reinforced concrete, or composite with steel built up sections.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy