You must be a CTBUH Member to view this resource.
880 North Lake Shore Drive
Building
Completed
1951
Residential
All-Steel
82.3 m / 270 ft
26
174
2
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
25 May 2015 - Event
16 October 2005
Robert M. Lau, Roosevelt University
This paper will present economic issues that drove design solutions for Tall Buildings. Starting from the 19th century planning of Central Business Districts (rectilinear), we...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy