This project was redesigned and replaced by Chelsea Green Hotel Redevelopment Tower 1
You must be a CTBUH Member to view this resource.
33 Gerrard Street West Tower 3
Eaton Chelsea Redevelopment Tower 2
Building
Vision
Residential
163.4 m / 536 ft
50
480
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy