Filter by
You must be a CTBUH Member to view this resource.
111 South Wacker
Building
Completed
2005
Office
Concrete-Steel Composite
LEED Gold
207.6 m / 681 ft
51
2
8
135,359 m² / 1,456,992 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
20 September 2012 | Chicago
Today, urbanism is synonymous with tall buildings, and because of their symbolic nature a great deal of attention is given to how these buildings meet...
17 September 2021
The construction sector accounts for 39 percent of all global emissions, but to avoid catastrophic climate-related disasters, these emissions must be reduced significantly, with many...
20 September 2012 | Chicago
Today, urbanism is synonymous with tall buildings, and because of their symbolic nature a great deal of attention is given to how these buildings meet...
11 October 2011 | Chicago
Integrating and even celebrating the structure of a building through the architectural design often leads to dramatic and memorable buildings. To achieve the best outcome...
17 September 2021
The construction sector accounts for 39 percent of all global emissions, but to avoid catastrophic climate-related disasters, these emissions must be reduced significantly, with many...
21 September 2012
James Goettsch, Goettsch Partners
If you are concerned about the urban habitat, you have to be concerned about whether or not buildings provide a positive experience at the ground...
16 October 2005
Robert M. Lau, Roosevelt University
This paper will present economic issues that drove design solutions for Tall Buildings. Starting from the 19th century planning of Central Business Districts (rectilinear), we...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy