You must be a CTBUH Member to view this resource.
1000M
1000 South Michigan
Building
Completed
2024
Residential
All-Concrete
245.4 m / 805 ft
73
1
738
325
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
17 June 2024
1000M, the newest residential skyscraper in downtown Chicago, officially opened on 13 June 2024. Designed by the late legendary architect Helmut Jahn, the 73-story tower...
17 June 2024
1000M, the newest residential skyscraper in downtown Chicago, officially opened on 13 June 2024. Designed by the late legendary architect Helmut Jahn, the 73-story tower...
02 August 2023
The 73-story 1000M tower, developed by Time Equities, JK Equities, and Oak Capitals, has officially topped off with the final concrete floor poured. The skyscraper...
10 December 2021
Construction is set to restart at a 74-story Helmut Jahn-designed building in downtown Chicago after developers secured a US$305 million loan and changed plans to...
26 January 2021
After losing their financing last year, the New York City developers of a stalled 74-story residential high-rise next to Grant Park are trying to jump-start...
10 July 2020
A Helmut Jahn-designed skyscraper along South Michigan Avenue is on hold at least until September 2020 and buyers of the luxury units are being offered...