5226
Global
Height rank

Poly International Plaza – Dawangjing

Beijing
Height
1
To Tip:
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest point of the building, irrespective of material or function of the highest element (i.e., including antennae, flagpoles, signage and other functional-technical equipment).
161.2 m / 529 ft
2
Architectural:
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the architectural top of the building, including spires, but not including antennae, signage, flag poles or other functional-technical equipment. This measurement is the most widely utilized and is employed to define the Council on Tall Buildings and Urban Habitat (CTBUH) rankings of the "World's Tallest Buildings."
161.2 m / 529 ft
3
Occupied:
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest occupied floor within the building.
135.8 m / 445 ft
  Floors
Above Ground
The number of floors above ground should include the ground floor level and be the number of main floors above ground, including any significant mezzanine floors and major mechanical plant floors. Mechanical mezzanines should not be included if they have a significantly smaller floor area than the major floors below. Similarly, mechanical penthouses or plant rooms protruding above the general roof area should not be counted. Note: CTBUH floor counts may differ from published accounts, as it is common in some regions of the world for certain floor levels not to be included (e.g., the level 4, 14, 24, etc. in Hong Kong).
31
Below Ground
The number of floors below ground should include all major floors located below the ground floor level.
3
1 2 3 Poly International Plaza – Dawangjing
Height 161.2 m / 529 ft
Floors 31
Official Name
The current legal building name.

Poly International Plaza – Dawangjing

Other Names
Other names the building has commonly been known as, including former names, common informal names, local names, etc.

Poly Dawangjing Plaza Tower 1, Poly Dawangjing Plaza Tower 1, Poly Dawangjing, Dawangjing 636

Name of Complex
A complex is a group of buildings which are designed and built as pieces of a greater development.

Poly International Plaza

Type
CTBUH collects data on two major types of tall structures: 'Buildings' and 'Telecommunications / Observation Towers.' A 'Building' is a structure where at least 50% of the height is occupied by usable floor area. A 'Telecommunications / Observation Tower' is a structure where less than 50% of the structure's height is occupied by usable floor area. Only 'Buildings' are eligible for the CTBUH 'Tallest Buildings' lists.

Building

Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished

Completed

Completion

2016

Country
The CTBUH follows the United Nations's definition of Country, and thus uses the lists and codes established by that organization.

China

City
The CTBUH follows the United Nations's definition of City, and thus uses the lists and codes established by that organization.

Beijing

Function
A single-function tall building is defined as one where 85% or more of its usable floor area is dedicated to a single usage. Thus a building with 90% office floor area would be said to be an "office" building, irrespective of other minor functions it may also contain.

A mixed-use tall building contains two or more functions (or uses), where each of the functions occupy a significant proportion of the tower's total space. Support areas such as car parks and mechanical plant space do not constitute mixed-use functions. Functions are denoted on CTBUH "Tallest Building" lists in descending order, e.g., "hotel/office" indicates hotel function above office function.

Office

Structural Material
All-Steel
Both the main vertical/lateral structural elements and the floor spanning systems are constructed from steel. Note that a building of steel construction with a floor system of concrete planks or concrete slab on top of steel beams is still considered an “all-steel” structure as the concrete elements are not acting as the primary structure.

All-Concrete
Both the main vertical/lateral structural elements and the floor spanning systems are constructed from concrete which has been cast in place and utilizes steel reinforcement bars and/or steel reinforced concrete which has been precast as individual components and assembled together on-site.

All-Timber
Both the main vertical/lateral structural elements and the floor spanning systems are constructed from timber. An all-timber structure may include the use of localized non-timber connections between timber elements. Note that a building of timber construction with a floor system of concrete planks or concrete slab on top of timber beams is still considered an “all-timber” structure as the concrete elements are not acting as the primary structure.

Mixed-Structure
Utilizes distinct systems (e.g. all-steel, all-concrete, all-timber), one on top of the other. For example, a Steel Over Concrete indicates an all-steel structural system located on top of an all-concrete structural system, with the opposite true of Concrete Over Steel.

Composite
A combination of materials (e.g. steel, concrete, timber) are used together in the main structural elements. Examples include buildings which utilize: steel columns with a floor system of reinforced concrete beams; a steel frame system with a concrete core; concrete-encased steel columns; concrete-filled steel tubes; etc. Where known, the CTBUH database breaks out the materials used within a composite building’s primary structural elements.

Composite

Energy Label

Pre-certified as LEED Silver under the LEED v3 Core and Shell

Height
Architectural
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the architectural top of the building, including spires, but not including antennae, signage, flag poles or other functional-technical equipment. This measurement is the most widely utilized and is employed to define the Council on Tall Buildings and Urban Habitat (CTBUH) rankings of the "World's Tallest Buildings."

161.2 m / 529 ft

To Tip
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest point of the building, irrespective of material or function of the highest element (i.e., including antennae, flagpoles, signage and other functional-technical equipment).
161.2 m / 529 ft
Occupied
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest occupied floor within the building.
135.8 m / 445 ft
Floors Above Ground
The number of floors above ground should include the ground floor level and be the number of main floors above ground, including any significant mezzanine floors and major mechanical plant floors. Mechanical mezzanines should not be included if they have a significantly smaller floor area than the major floors below. Similarly, mechanical penthouses or plant rooms protruding above the general roof area should not be counted. Note: CTBUH floor counts may differ from published accounts, as it is common in some regions of the world for certain floor levels not to be included (e.g., the level 4, 14, 24, etc. in Hong Kong).

31

Floors Below Ground
The number of floors below ground should include all major floors located below the ground floor level.

3

# of Parking Spaces
Number of Parking Spaces refers to the total number of car parking spaces contained within a particular building.

815

# of Elevators
Number of Elevators refers to the total number of elevator cars (not shafts) contained within a particular building (including public, private and freight elevators).

20

Tower GFA
Tower GFA refers to the total gross floor area within the tower footprint, not including adjoining podiums, connected buildings or other towers within the development.

61,223 m² / 658,999 ft²

Rankings

#
5226
Tallest in the World
#
48
Tallest in Beijing

Construction Schedule

2010

Proposed

2011

Construction Start

2016

Completed

Architect
Design

Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.

Architect of Record

Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.

Structural Engineer
Engineer of Record

The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.

MEP Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

Other Consultant

Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).

Landscape
Sustainability
Material Supplier

Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).

Elevator
Owner/Developer
Poly Real Estate Group Co. Ltd.
Architect
Design

Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.

Architect of Record

Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.

Structural Engineer
Engineer of Record

The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.

MEP Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

Contractor
Main Contractor

The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.

China Construction Third Engineering Bureau Co., Ltd.
Other Consultant

Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).

Façade

These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.

Jangho Group Co., Ltd.
Interiors
Beijing Qingshang Architectural Ornamental Engineering
Landscape
Lighting
ESCOFET; Frances Krahe & Associates, Inc.
Sustainability
Material Supplier

Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).

Aluminium
Shandong Dahua Rixin Aluminum
Cladding
Jangho Group Co., Ltd.
Elevator
Flooring
Yuefu; Interface
Hardware
Kohler

CTBUH Awards & Distinctions

Best Tall Building, by Region, Asia & Australasia 2018 Award of Excellence

2018 CTBUH Awards

 

Videos

31 May 2018 | Beijing

A Diagrid of Distinction Enables a Sun-Lit, Social Skyscraper

Poly International Plaza is the first structure of its kind – incorporating a four-story, pure-axial load, super-diagrid frame without perimeter columns. Through its technical and...

 

Research

01 March 2018

A Tall Building Ethos of Integration

Brian Lee, Skidmore, Owings & Merrill

The last decade has seen great design opportunities for tall building construction around the globe. The best designs represent a new generation of skyscrapers that...

01 March 2018

A Tall Building Ethos of Integration

Brian Lee, Skidmore, Owings & Merrill

The last decade has seen great design opportunities for tall building construction around the globe. The best designs represent a new generation of skyscrapers that...

01 September 2017

Site | Structure | Architecture – Projects that Create Change

Leo Chow & Mark P. Sarkisian, Skidmore, Owings & Merrill LLP

China’s rapid growth has created great opportunities for design and construction of projects that not only transform sites but cities. This work combines local, national,...

01 December 2016

An Overview of Structural & Aesthetic Developments in Tall Buildings Using Exterior Bracing & Diagrid Systems

Kheir Al-Kodmany, University of Illinois; Mir M. Ali, University of Illinois at Urbana-Champaign

There is much architectural and engineering literature which discusses the virtues of exterior bracing and diagrid systems in regards to sustainability - two systems which...

01 December 2016

The Emergence of the Diagrid - It’s All About the Node

Terri Meyer Boake, University of Waterloo

The diagrid structural system for constructing tall buildings is a recent invention. Debuting in 2004 with the construction of the Swiss Re Tower in London,...

01 December 2016

The Rational Optimization and Evolution of the Structural Diagonal Aesthetic in Supertall Towers

Charles Besjak, Preetam Biswas & Tobias Fast, SOM

In the design of supertall towers, engineers often find the conventional frame systems used in countless buildings in the past decades incapable of providing the...

17 October 2016

Climate-Responsive Exterior Enclosure Design

Keith Boswell & Michael Duncan, Skidmore, Owings & Merrill LLP

In this paper, three different solutions in three different regions of China illustrate best practices for the design and execution of optimized building enclosure systems....

17 October 2016

SOM and China: Evolving Skyscraper Design Amid Rapid Urban Growth

Scott Duncan & Yue Zhu, SOM

China’s rapid urban and economic growth has challenged designers, engineers, and planners to innovate and collaborate to meet the needs of a changing country. Skidmore,...

26 October 2015

Three-dimensional Exterior Bracing Systems for Tall Buildings

Rupa Garai, Mark Sarkisian, Neville Mathias & Andrew Krebs, Skidmore, Owings and Merrill

The use of outriggers with and without belt trusses has become an expedient of choice for harnessing the three dimensional potential of tall buildings to...