Metro City Phase I

Hong Kong
  • Facts
  • Login

    You must be a CTBUH Member to view this resource.

    Metrics
Official Name
The current legal building name.

Metro City Phase I

Type

Complex

Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished

Completed

Country

China

City

Hong Kong

Function

residential

# of Apartments

2,048

Map of Buildings in Complex

Note: Only buildings that have GPS coordinates recorded are displayed.

 

List of Buildings in Complex

Rank
Building Name
Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished
Completion
Height
Floors
Material
Use
1 Metro City I Tower 3
1996 153.9 m / 505 ft 43 All-Concrete Residential
1 Metro City I Tower 4
1996 153.9 m / 505 ft 43 All-Concrete Residential
1 Metro City I Tower 5
1996 153.9 m / 505 ft 43 All-Concrete Residential
1 Metro City I Tower 6
1996 153.9 m / 505 ft 43 All-Concrete Residential
5 Metro City I Tower 1
1996 153.9 m / 505 ft 42 All-Concrete Residential
5 Metro City I Tower 2
1996 153.9 m / 505 ft 42 All-Concrete Residential

Research

08 November 2022

Case Study: DJI Sky City, Shenzhen

Grant Brooker & Hai Lin

A new headquarters for DJI, a robotics company, was completed in Shenzhen in September 2022. Across the two towers, office and research spaces are arranged...