Member Since: 2017
Member Offices: New York City
Fisher Marantz Stone (FMS) are lighting designers. They explore and understand architectural design and creative intent to achieve a seamless integration of light and space. They use light to narrate the architect’s story enhancing the communication of design through environmentally and economically conscious lighting solutions.
Since 1971 FMS have applied their expertise to a wide breadth of projects including museums, towers, corporate interiors, concert halls, private residences, casinos, universities, airports and train stations. They use the latest advancements in technology to create sustainable and manageable solutions that aesthetically and figuratively function within each environment.
Other
Membership Level
Silver
Member Since
2017
Member Offices
New York City
Rank |
Name |
Status
Completed Architecturally Topped Out Structurally Topped Out Under Construction On Hold Never Completed Proposed Vision Demolished Competition Entry Canceled Proposed Renovation Under Renovation Renovated Under Demolition |
Height |
---|---|---|---|
1 |
1000 m / 3,281 ft |
||
2 |
828 m / 2,717 ft |
||
3 |
644 m / 2,113 ft |
||
4 |
475.6 m / 1,560 ft |
||
5 |
420.5 m / 1,380 ft |
||
6 |
367.4 m / 1,205 ft |
||
7 |
354.2 m / 1,162 ft |
||
8 |
328.9 m / 1,079 ft |
||
9 |
306.4 m / 1,005 ft |
||
10 |
301 m / 988 ft |
CTBUH Annual Conference, Presenter, 2018
CTBUH Annual Conference, Presenter, 2017
A subsidiary of China’s largest construction group has suspended work on one of the nation’s tallest skyscrapers after the developer became the latest in a...
London’s future second-tallest building, 1 Undershaft, has been given the go-ahead after a three-year battle. The 951-foot (290-meter) skyscraper, nicknamed “The Trellis,” will be topped...
Construction work at Permodalan Nasional Bhd’s (PNB) Merdeka 118 has been delayed by roughly two to three months due to restrictive measures taken to curb...
Fisher Marantz Renfro Stone
150 m+ Buildings
300 m+ Buildings
Average Building Age*
10 Years
Most Common Function*
Office, 18 Buildings
Most Common Material*
Composite, 14 Buildings
* Based on 150 m+ buildings currently in the database.
*Based on 30 Completed & Under Construction Buildings
NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.
NOTE: Gross-to-Net Height is defined as architectural height minus height of highest occupied floor. Therefore, the Gross-to-Net Height is only calculated for buildings that have both the architectural height and the highest occupied floor height recorded.
Create your own charts using the Explore Data tool.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy