CTBUH Gold Member

Windtech Consultants

About

Member Since: 2009

Member Offices: Sydney

Website: http://www.windtech.com.au/

WINDTECH Consultants is a company of consulting engineers specializing in the analysis of wind effects on buildings, structures and the environment. Since 1991, the company has been providing wind engineering and related high technology services for over 2,000 major building projects, assisting planners and building design professionals.

The trend to building taller, larger and lighter structures has highlighted the need for specialist services in providing accurate analyses of the effect of winds. This generally results in significant savings in the cost of the facade and the structure in comparison with the use of estimates from wind loading standards.

Analysis techniques developed by WINDTECH Consultants over the past few years place the company at the forefront of its field in the analysis of the effect of wind on the most complex structures.

Fields of Expertise

Environmental Engineering; Other; Wind Engineering

Membership details

Membership Level

Gold

Member Since

2009

Member Offices

  • Sydney

Buildings

Rank
Name
Status

Completed

Architecturally Topped Out

Structurally Topped Out

Under Construction

On Hold

Proposed

Vision

Never Completed

Demolished

Competition Entry

Canceled

Proposed Renovation

Under Renovation

Renovated

Under Demolition

Height

1

JW Marriott Marquis Hotel Dubai Tower 1

355.4 m / 1,166 ft

2

JW Marriott Marquis Hotel Dubai Tower 2

355.4 m / 1,166 ft

3

The Index

326 m / 1,070 ft

4

Q1 Tower

322.5 m / 1,058 ft

5

Kempinski Hotel & Residences

308 m / 1,010 ft

6

Burj Rafal

307.9 m / 1,010 ft

7

Gama Tower

285.5 m / 937 ft

8

8 Conlay Tower A

277 m / 909 ft

9

Salesforce Tower

263.1 m / 863 ft

10

Menara Astra

261.5 m / 858 ft

Awards

ARC by Crown Group

Award of Excellence: ARC by Crown Group

Best Tall Building under 100 meters 2021

Ctbuh Leaders

Niall O'Sullivan

Niall O'Sullivan

CTBUH MEP Systems Committee, 2018 – Present

London

Tony Rofail

Tony Rofail

CTBUH Expert Peer Review Committee, 2018 – Present

Sydney

Aaron Lefcovitch

Aaron Lefcovitch

CTBUH Live-Streamed Conference, Singapore Steering Committee, 2020 – Present

Singapore

Building Completions Timeline

 

Videos

16 September 2014

Innovative Designs for Natural Ventilation in High-Rise Buildings

Consideration of energy efficient design strategies has become one of the primary considerations by leading architectural firms during the conceptual design phases and is an...

Research

16 September 2014

Innovative Designs for Natural Ventilation in High-Rise Buildings

Consideration of energy efficient design strategies has become one of the primary considerations by leading architectural firms during the conceptual design phases and is an...

Global News

07 December 2020

Developer Lodges Dual-Tower West End Plans in Brisbane

Private developer Manly Properties has unveiled plans to develop a dual tower residential development and public riverside space for its 1.1-hectare landholding in Brisbane’s West...

Statistics

150 m+ Buildings

300 m+ Buildings

Average Building Age*

5 Years

Most Common Function*

Residential (49%), 47 Buildings

Most Common Material*

Concrete (95%), 86 Buildings

* Based on 150 m+ buildings currently in the database.

Total: 96 Buildings for which a function has been assigned.
 
Total: 91 Buildings for which a material has been assigned.
 

*Based on 97 Completed & Under Construction Buildings

Building Completions Timeline

 

Construction Time Chart

NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.