Member Offices: Dallas, Denver, Detroit, Dubai, Houston, London, Los Angeles, Mexico City, Miami, New Delhi, New York City, Orlando, Shanghai, Singapore, Tokyo, Washington D.C.
Website: http://www.hksinc.com/
HKS is an international design firm with 24 locations offering great design at the local level and more than 1,300 architects, interior designers, urban designers, scientists, artists, anthropologists and more. We create places that delight, heal and stimulate peak performance.
HKS Shanghai utilizes state-of-the-art design methods and our unique design philosophies to produce excellent project experiences for our clients in Asia. Our Shanghai office has worked in China since 2010 and has a portfolio that includes healthcare, sports, hospitality, mixed-use and mission critical projects.
Architecture; Interior Design; Urban Design
Membership Level
Silver
Member Since
Member Offices
Dallas
Denver
Detroit
Dubai
Houston
London
Los Angeles
Mexico City
Miami
New Delhi
New York City
Orlando
Shanghai
Singapore
Tokyo
Washington D.C.
Rank |
Name |
Status
Completed Architecturally Topped Out Structurally Topped Out Under Construction On Hold Proposed Vision Never Completed Demolished Competition Entry Canceled Proposed Renovation Under Renovation Renovated Under Demolition |
Completion |
Height |
---|---|---|---|---|
1 |
1990 |
292.9 m / 961 ft |
||
2 |
1986 |
270.1 m / 886 ft |
||
3 |
2000 |
257.4 m / 844 ft |
||
4 |
2023 |
254.6 m / 835 ft |
||
5 |
1987 |
239.9 m / 787 ft |
||
6 |
1992 |
236.5 m / 776 ft |
||
7 |
2015 |
234.9 m / 771 ft |
||
8 |
2021 |
210 m / 689 ft |
||
9 |
1982 |
196.5 m / 645 ft |
||
10 |
2007 |
195.7 m / 642 ft |
“Small” Lake City keeps growing up. Check out the ever-rising skyline, where 2021 and 2022 will bring three new skyscrapers to the heart of Utah’s...
Developers are breaking ground next week, 7 December 2020, on a new downtown Dallas luxury hotel. Plano-based Sam Moon Group is building the 283-room JW...
After 20 years of unrealized development plans for the approximately 3.3-acre (1.3-hectare) property at the southwest corner of Cesar Chavez and Red River Streets near...
150 m+ Buildings
Average Building Age*
18 Years
Most Common Function*
Office (50%), 38 Buildings
Most Common Material*
Concrete (69%), 36 Buildings
* Based on 150 m+ buildings currently in the database.
*Based on 76 Completed & Under Construction Buildings
NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.
Create your own charts using the Explore Data tool.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy