RANK
|
Name
|
Status
Completed Architecturally Topped Out Structurally Topped Out Under Construction On Hold Proposed Vision Never Completed Demolished Competition Entry Canceled Proposed Renovation Under Renovation Renovated Under Demolition |
Height
|
---|---|---|---|
1 | Radisson Blu Plaza Hotel | 117 m / 384 ft | |
2 | Biskop Gunnerus Gate 14 | 111 m / 364 ft | |
3 | Radisson Blu Scandinavia Hotel Oslo | 67 m / 220 ft | |
4 | DnB Nor B | 67 m / 220 ft | |
5 | Dronning Eufemias Gate 16 | 67 m / 220 ft | |
6 | Deloitte Bygget | 67 m / 220 ft | |
7 | Oslo Rådhus 1 | 66 m / 217 ft | |
8 | Økernsenteret | 65 m / 213 ft | |
9 | KLP-bygget | 63.2 m / 207 ft | |
10 | Oslo Rådhus 2 | 63 m / 207 ft |
Not enough data. Please change your search criteria.
Logo
|
Name
|
Level
|
# of 150m+ buildings
|
|
---|---|---|---|---|
Moelven Limtre |
Silver
|
0 | MATR | |
Nordic Office of Architecture |
Silver
|
0 | ARCH | |
Snøhetta |
Silver
|
8 | LAND |
CTBUH Scandinavia Chapter Presents: Adaptive Reuse in the Nordics - Where the Past and Future Meet
30 March 2022
The CTBUH Scandinavia Chapter hosts a lively and…
Tall Timber: A Global Audit
26 June 2017
The CTBUH has produced its latest Tall Buildings…
24 May 2022
Two key projects are presented, in which steel-timber hybrid solutions allow for optimization of structural performance and material efficiency. Using hybrid joints can deal efficiently...
23 September 2024
Envisioned by Haptic and Ramboll, this proposal for a flexible and regenerative high-rise has been adapted for a trio of contrasting climates, writes Dimitris Argyros.
03 December 2021
Design Converts Oslo into an Innovation District
Architect Bjarke Ingels Group as well as a team of collaborators, composed of A-lab, Comte, Civitas & Menon, have designed Oslo Science City. This re-envisioning...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy