Rank |
Name |
Status
Completed Architecturally Topped Out Structurally Topped Out Under Construction On Hold Proposed Vision Never Completed Demolished Competition Entry Canceled Proposed Renovation Under Renovation Renovated Under Demolition |
Height |
---|---|---|---|
1 |
136.4 m / 448 ft |
||
2 |
129 m / 423 ft |
||
3 |
127 m / 417 ft |
||
4 |
119 m / 390 ft |
||
5 |
118 m / 387 ft |
||
6 |
118 m / 387 ft |
||
7 |
114 m / 374 ft |
||
8 |
113 m / 371 ft |
||
9 |
110 m / 361 ft |
||
10 |
101 m / 331 ft |
Not enough data. Please change your search criteria.
Logo
|
Name
|
City
|
Level
|
# of 150m+ buildings
|
|
---|---|---|---|---|---|
![]() |
Platinum |
334 |
CIV • STRC • WIND • ENVE • PMNG • COST • FAC • FIRE • MEP • VERC |
||
![]() |
Silver |
0 |
DEV |
2019 Global Walking Tour: 50 Forward | 50 Back
27 Jun-09 August 2019
Join the CTBUH Urban Habitat / Urban Design…
CTBUH 2019 Global Walking Tour: 50 Forward | 50 Back
27 June 2019
The CTBUH Urban Habitat / Urban Design Committee…
A disused grain silo in Cape Town has been adapted to accommodate Africa’s first international museum dedicated to contemporary African art. A 33-meter-tall storage annex...
South Africa is set to commence construction of soon to be the tallest skyscraper in Cape Town once it receives approval from the Reserve Bank....
The Sea Point, Fresnaye and Bantry Bay Ratepayers’ Association is objecting to the Fulcrum development, after it was approved by the Municipal Planning Tribunal in...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy