You must be a CTBUH Member to view this resource.
Warsaw Unit
Spinnaker Tower, Spinnaker
Building
Completed
2021
Office
All-Concrete
WELL v2 Core, BREAM EXCELLENT, Well Health & Safety Rating
200.7 m / 659 ft
46
3
490
21
8 m/s
57,000 m² / 613,543 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
Warsaw Unit’s uniqueness lies in its architecture, which refers to the modernist heritage enriched with innovative solutions. The podium of the building is covered by kinetic facade known as the “Dragon Skin”, made of thousands of moving plates. It will visibly react to every puff of wind, forming on its surface unique images modeled by forces of nature.
The ground floor of the skyscraper hosts commercial spaces and food amenities, available from the street level. The building will also provide a multi-storey garage for over 450 cars as well as infrastructure for cyclists, including parking lot for bicycles, locker rooms and showers.
Warsaw Unit is equipped with innovative technology solutions which, in the event that the government announces a state of epidemic threat, will enable building management to immediately switch to the pandemic mode. This includes innovative HVAC systems using only fresh air, disinfecting UV lamps in elevators and in air conditioning systems, contactless communication via virtual reception, and a special smartphone application with so-called pandemic mode.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policyWe are identifying potential improvements to the CTBUH Skyscraper Center database. The first step of this research is to understand the users of the database and what they are looking for. Please take a couple moments to share your feedback.
* Required