You must be a CTBUH Member to view this resource.
Pavilions Building 5
Pavilions by Mirvac Building 5
Building
Completed
2020
Residential
All-Concrete
76 m / 249 ft
24
5
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
20 May 2020
Mirvac has topped out its AUD$460 million (US$303 million) mixed-use Pavilions development in Sydney's Olympic Park in the same week as the ASX-listed developer won...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policyWe are identifying potential improvements to the CTBUH Skyscraper Center database. The first step of this research is to understand the users of the database and what they are looking for. Please take a couple moments to share your feedback.
* Required