219
Global
Height rank

One Za'abeel The Tower

Dubai
Height
1
To Tip:
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest point of the building, irrespective of material or function of the highest element (i.e., including antennae, flagpoles, signage and other functional-technical equipment).
301.4 m / 989 ft
2
Architectural:
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the architectural top of the building, including spires, but not including antennae, signage, flag poles or other functional-technical equipment. This measurement is the most widely utilized and is employed to define the Council on Tall Buildings and Urban Habitat (CTBUH) rankings of the "World's Tallest Buildings."
301.4 m / 989 ft
3
Occupied:
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest occupied floor within the building.
281.8 m / 925 ft
  Floors
Above Ground
The number of floors above ground should include the ground floor level and be the number of main floors above ground, including any significant mezzanine floors and major mechanical plant floors. Mechanical mezzanines should not be included if they have a significantly smaller floor area than the major floors below. Similarly, mechanical penthouses or plant rooms protruding above the general roof area should not be counted. Note: CTBUH floor counts may differ from published accounts, as it is common in some regions of the world for certain floor levels not to be included (e.g., the level 4, 14, 24, etc. in Hong Kong).
68
Below Ground
The number of floors below ground should include all major floors located below the ground floor level.
7
1 2 3 One Za'abeel The Tower
Height 301.4 m / 989 ft
Floors 68
Official Name
The current legal building name.

One Za'abeel The Tower

Other Names
Other names the building has commonly been known as, including former names, common informal names, local names, etc.

SIRO Hotel, One & Only Resort, Investment Corporation of Dubai Headquarters, One Za'abeel Tower A

Name of Complex
A complex is a group of buildings which are designed and built as pieces of a greater development.

One Za'abeel

Type
CTBUH collects data on two major types of tall structures: 'Buildings' and 'Telecommunications / Observation Towers.' A 'Building' is a structure where at least 50% of the height is occupied by usable floor area. A 'Telecommunications / Observation Tower' is a structure where less than 50% of the structure's height is occupied by usable floor area. Only 'Buildings' are eligible for the CTBUH 'Tallest Buildings' lists.

Building

Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished

Completed

Completion

2023

Country
The CTBUH follows the United Nations's definition of Country, and thus uses the lists and codes established by that organization.

United Arab Emirates

City
The CTBUH follows the United Nations's definition of City, and thus uses the lists and codes established by that organization.

Dubai

Function
A single-function tall building is defined as one where 85% or more of its usable floor area is dedicated to a single usage. Thus a building with 90% office floor area would be said to be an "office" building, irrespective of other minor functions it may also contain.

A mixed-use tall building contains two or more functions (or uses), where each of the functions occupy a significant proportion of the tower's total space. Support areas such as car parks and mechanical plant space do not constitute mixed-use functions. Functions are denoted on CTBUH "Tallest Building" lists in descending order, e.g., "hotel/office" indicates hotel function above office function.

Serviced Apartments / Hotel / Office

Structural Material
All-Steel
Both the main vertical/lateral structural elements and the floor spanning systems are constructed from steel. Note that a building of steel construction with a floor system of concrete planks or concrete slab on top of steel beams is still considered an “all-steel” structure as the concrete elements are not acting as the primary structure.

All-Concrete
Both the main vertical/lateral structural elements and the floor spanning systems are constructed from concrete which has been cast in place and utilizes steel reinforcement bars and/or steel reinforced concrete which has been precast as individual components and assembled together on-site.

All-Timber
Both the main vertical/lateral structural elements and the floor spanning systems are constructed from timber. An all-timber structure may include the use of localized non-timber connections between timber elements. Note that a building of timber construction with a floor system of concrete planks or concrete slab on top of timber beams is still considered an “all-timber” structure as the concrete elements are not acting as the primary structure.

Mixed-Structure
Utilizes distinct systems (e.g. all-steel, all-concrete, all-timber), one on top of the other. For example, a Steel Over Concrete indicates an all-steel structural system located on top of an all-concrete structural system, with the opposite true of Concrete Over Steel.

Composite
A combination of materials (e.g. steel, concrete, timber) are used together in the main structural elements. Examples include buildings which utilize: steel columns with a floor system of reinforced concrete beams; a steel frame system with a concrete core; concrete-encased steel columns; concrete-filled steel tubes; etc. Where known, the CTBUH database breaks out the materials used within a composite building’s primary structural elements.

Concrete-Steel Composite

Energy Label

LEED Gold targeted

Height
Architectural
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the architectural top of the building, including spires, but not including antennae, signage, flag poles or other functional-technical equipment. This measurement is the most widely utilized and is employed to define the Council on Tall Buildings and Urban Habitat (CTBUH) rankings of the "World's Tallest Buildings."

301.4 m / 989 ft

To Tip
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest point of the building, irrespective of material or function of the highest element (i.e., including antennae, flagpoles, signage and other functional-technical equipment).
301.4 m / 989 ft
Occupied
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest occupied floor within the building.
281.8 m / 925 ft
Floors Above Ground
The number of floors above ground should include the ground floor level and be the number of main floors above ground, including any significant mezzanine floors and major mechanical plant floors. Mechanical mezzanines should not be included if they have a significantly smaller floor area than the major floors below. Similarly, mechanical penthouses or plant rooms protruding above the general roof area should not be counted. Note: CTBUH floor counts may differ from published accounts, as it is common in some regions of the world for certain floor levels not to be included (e.g., the level 4, 14, 24, etc. in Hong Kong).

68

Floors Below Ground
The number of floors below ground should include all major floors located below the ground floor level.

7

# of Apartments
Number of Apartments refers to the total number of residential units (including both rental units and condominiums) contained within a particular building.

100

# of Hotel Rooms
Number of Hotel Rooms refers to the total number of hotel rooms contained within a particular building.

497

Top Elevator Speed
Top Elevator Speed refers to the top speed capable of being achieved by an elevator within a particular building, measured in meters per second.

8 m/s

Rankings

#
219
Tallest in the World
#
41
Tallest in Middle East
#
34
Tallest in United Arab Emirates
#
30
Tallest in Dubai

Construction Schedule

2014

Proposed

2016

Construction Start

2023

Completed

Developer
Architect
Design

Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.

Architect of Record

Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.

WSP
Structural Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

WSP
Peer Review

The Peer Review Engineer traditionally comments on the information produced by another party, and to render second opinions, but not to initiate what the design looks like from the start.

MEP Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

WSP
Other Consultant

Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).

Acoustics
WSP
Audio Visual
WSP
Civil
WSP
Façade

These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.

Fire
WSP
Geotechnical
WSP
Interiors
WSP
Life Safety
WSP
Property Management
Security
WSP
Sustainability
WSP
Traffic
WSP
Vertical Transportation
WSP
Waste Management
WSP
Wind
Material Supplier

Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).

Fire Stopping
Owner
Investment Corporation of Dubai
Developer
Occupier/Tenant
Investment Corporation of Dubai
Architect
Design

Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.

Architect of Record

Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.

WSP
Structural Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

WSP
Peer Review

The Peer Review Engineer traditionally comments on the information produced by another party, and to render second opinions, but not to initiate what the design looks like from the start.

MEP Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

WSP
Project Manager

The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.

Mace Limited
Contractor
Main Contractor

The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.

ALEC Engineering and Contracting
Electrical
ALEMCO
Steel
Eversendai Engineering
Other Consultant

Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).

Acoustics
WSP
Aquatic
Barr + Wray Limited
Artist
Capsule Arts; Farmboy
Audio Visual
WSP
Civil
WSP
Commissioning
AESG
Façade

These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.

Fire
WSP
Food Service
Michael Chabowski Technical Services
Geotechnical
WSP
Interiors
DENNISTON; LW Design Group; WSP
Landscape
Cracknell; Stufish Entertainment Architects
Life Safety
WSP
Lighting
Lighting Planners Associates
Marketing
BRASH; Brimaxx
Property Management
Security
WSP
Sustainability
WSP
Traffic
WSP
Vertical Transportation
Crowd Dynamics; WSP
Waste Management
WSP
Way Finding
Limah Design Consultants
Wind
Material Supplier

Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).

Aluminium
Al Abbar Group
Concrete
Unibeton; Unimix
Fire Stopping

Research

20 October 2018

Polycentric Cities: The Future of Vertical Urbanism

CTBUH 2018 Conference Speakers

As we approach the new normality of cities housing 10 million or more inhabitants, those best positioned for the future are evolving along polycentric, multi-nodal...

 

Global News

01 March 2024

Iconic Dubai Development with Cantilever is Inaugurated

The official opening of the One Za’abeel project, developed by the Investment Corporation of Dubai and designed by Japanese architectural consulting firm Nikken Sekkei, had...

About One Za'abeel The Tower

The One Za’abeel development takes the idea of the “gateway” to a new level. The two towers, containing office functions (Tower 1, 330 meters) and residential / hotel functions (Tower 2, 235 meters), are positioned on either side of an elevated highway. A horizontal “Link” structure connects the two towers and proceeds past the edge of Tower 1 in a dramatic cantilever, providing additional structural stability as well as a signature event space. The Link, suspended 100 meters above the ground, offers a choice of attractions, including restaurants, lounges, cafes, bars, and observation deck, a gym, a spa, a pool, a banquet hall and a rooftop terrace.

The superstructure for the hotel and residential floors of both towers is comprised of a concrete core-and-outrigger system, which allows different column grids for each function. The system is based on a 3-meter module. The Link structure is a perimeter diagonal tube, with sufficient vertical and torsional stiffness and strength, so as to provide column-free space on its upper level.

The podium inclines from ground level to the roof, and is abundantly crowned with greenery and water bodies. The lobby of the hotels and serviced apartments is located on the lower levels of the slope, with welcoming views over water features, greenery, and the Link above. The top surface of the podium is richly landscaped, covering the entrances and drop-offs with shade.

01 March 2024

Iconic Dubai Development with Cantilever is Inaugurated

The official opening of the One Za’abeel project, developed by the Investment Corporation of Dubai and designed by Japanese architectural consulting firm Nikken Sekkei, had...

21 February 2023

One Za'abeel in Dubai Inches Closer to Grand Opening

One Za’abeel, the iconic mixed-use development located at the heart of Dubai, achieved a new milestone with the completion of its full glass cladding work...

10 September 2020

Cantilevered Skybridge Lifted Into Place at One Za'abeel, Dubai

Eversendai Corp passed a significant milestone in the construction of the One Za'abeel, a high-rise mixed-use luxury development in Dubai featuring one of the longest...

17 September 2019

Sliding Operations Begin on Massive Cantilevered Skybridge in Dubai

Ithra Dubai, a leading developer of community-oriented real estate projects, announced the start of the first phase of sliding “The Link”, a cantilevering skybridge, on...