You must be a CTBUH Member to view this resource.
Doosan Haeundae We've the Zenith Tower A
Building
Completed
2011
Residential
All-Concrete
300 m / 984 ft
80
6
1384
4474
21
6 m/s
128,595 m² / 1,384,185 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
11 June 2014
CTBUH Research
In this installment of Tall Buildings in Numbers, CTBUH considers how helipads are used on skyscrapers, and which are the highest in the world. The...
As Korea’s tallest completed all-residential towers, the three towers of the Zenith complex stand as an icon in Busan. In contrast to the surrounding buildings, they display curving and organic façades which create the cruciform-shaped plans. The design concept behind these towers was directly related to the geography of the site, which is surrounded on three sides by the sea. The curvilinear forms were also designed and sited to take advantage of views and daylighting, as well as to minimize the effects of wind forces. At their base, each of the towers has a lobby which opens up to a lushly planted plaza that connects the complex and creates a unique space for outdoor activities.
Emerging technologies in concrete construction were utilized in the design of the towers. The foundation mat thickness was reduced by as much as 700 mm through the use of strut-ties, and a structural health monitoring system was installed to carefully monitor the conditions of the building and ensure the safety of its residents.
11 June 2014
CTBUH Research
In this installment of Tall Buildings in Numbers, CTBUH considers how helipads are used on skyscrapers, and which are the highest in the world. The...
31 December 2011
Nathaniel Hollister & Antony Wood, CTBUH
The annual story is becoming a familiar one: 2007, 2008, 2009, 2010, and now 2011 have each sequentially broke the record for the most 200...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy